
Kitchen renovation
Wet and dry kitchen layouts, cabinetry, solid surface or quartz tops, tiling and full plumbing rework.
From RM18,000Kitchens, bathrooms and whole-house renovation across KL, PJ, Subang and Cheras. Fixed quotation before we start. 12-month workmanship warranty after we finish.
What we do
You deal with one project manager from the first site visit to the final touch-up. No chasing six subcontractors yourself.

Wet and dry kitchen layouts, cabinetry, solid surface or quartz tops, tiling and full plumbing rework.
From RM18,000
Full hack and rebuild, waterproofing with warranty, floor trap re-levelling, glass partitions and fittings.
From RM9,500
Terrace, semi-D and condo units taken from bare shell to move-in. Design drawings included before work starts.
From RM75,000
Cornice, L-box and cove lighting design. Sanded, sealed and painted to a flat finish with no visible joints.
From RM12/sq ft
Rewiring, DB upgrades, additional points and lighting circuits. Carried out by a competent wireman.
From RM120/point
Interior and exterior, crack patching and skim coat. Nippon or Dulux, with the colour code confirmed in writing.
From RM1.80/sq ftBefore and after
Every project gets photographed at handover so you can see exactly what changed — and so the next customer can too.
Ampang Jaya · 3-bedroom terrace · Kitchen hacked and rebuilt in 26 working days.
Before
After
Portfolio
Twelve of the last hundred. Tap any photo to see it full size.
How it works
The quotation you sign is the amount you pay, unless you ask for a variation in writing.
We come to your house, measure up, and listen to what you actually want. No charge, no obligation, and we will tell you if your budget does not match the scope.
Within 3 working daysAn itemised quotation with materials named and quantities listed. You will see the brand of tile and the thickness of the countertop, not just a lump sum.
3–5 working days after the visitLayout drawings and 3D visuals so you can see the finished space before we hack anything. Two rounds of revisions are included.
1–2 weeksOne project manager, a fixed schedule and photo updates on WhatsApp every few days. We handle the management office paperwork and permits.
3–10 weeks depending on scopeWe walk the site with you and fix the snag list before final payment. Workmanship is covered for 12 months, waterproofing for 5 years.
Final 10% on completionWhy choose us
CIDB registered with a valid SSM certificate and public liability cover. We will send you copies before you pay a deposit — you should ask every contractor for this.
Itemised, with brands and quantities. Variations are quoted and approved in writing before any extra work starts, so the final invoice holds no surprises.
Staged payments released against completed milestones, with a final 10% held until you sign off the snag list. We never ask for the full amount upfront.
12 months on workmanship, 5 years on bathroom waterproofing. If something moves or leaks in that window, we come back and fix it at no cost.
Testimonials
They hacked our kitchen on a Monday and we were cooking in it four weeks later, on the day they promised. The project manager answered every WhatsApp within an hour.
Nurul A. · Bandar Utama · Kitchen renovationWe got three quotations. Theirs was not the cheapest, but it was the only one that listed the actual tile brand and the waterproofing warranty. That told us enough.
Kelvin T. · Puchong · Two bathroomsFull renovation of a 30-year-old terrace. Wiring, ceiling, floors, everything. They dealt with the MBPJ paperwork and the neighbours, which I did not expect.
Sharmila R. · Petaling Jaya · Whole houseFree quotation
Send the details and we will arrange a site visit within three working days. WhatsApp is fastest if you already have photos.